Ecology Unit Specification: The Clauses to Write Into a Kitchen Exhaust Tender, and the Document That Answers Each One

An ecology unit specification is the set of clauses in a kitchen exhaust tender that fix what the electrostatic, UV-C and carbon stages must do and how that is proven. The clauses that go wrong are the ones no supplier can evidence, such as a cleaning interval. Paste the 30 clauses below, each with the document a bidder must file.

This page helps you decide which clauses to write into a kitchen exhaust tender or equipment schedule for an ecology unit, and what each clause makes a bidder file. It also shows which familiar clauses to rewrite because no supplier can evidence them. It does not size the unit, choose the stages your discharge needs, quote a price, or read the approvals a market requires. For configuration tables, see the kitchen ecology unit page and the LK-E series. If you are the buyer sending an enquiry rather than the consultant writing the tender, the ten inputs are on our electrostatic precipitator quotation page.

QuestionOur answer
What the sheet is30 clauses in eight groups, A to H, each with the document we file against it and a column stating what no supplier can evidence
Efficiency clauseWritten with the test method, the test airflow, the model tested, the report number and the laboratory’s accreditation; a design tier is stated separately and carries the word “design”
Pressure drop clauseStated per stage, each as a complete module at the design airflow, with the model and the basis named; a cell-only figure is not accepted
CertificatesFiled as copies that name the model numbers offered; our CE certificate FQC2602501 names LK30–LK480, LK30E1–LK150E1 and the UV series
Cleaning intervalNot a number in the specification; stated in writing for the site with the configuration proposal
SubmittalDatasheet, certificate copies, test reports, installation and commissioning manual with wiring diagrams, on request; the general arrangement drawing is prepared for the project
CommercialMinimum order one unit; 7–15 days for standard models; one year on the complete unit with UV lamps and carbon media as consumables; quotation within 24 hours on business days
Not on this pageSizing, stage selection, price, fan data, market approvals, and any clause we cannot put a document against

Specification clause, datasheet, submittal, certificate: four documents, four authors

A specification clause is written by the consultant and answered by a document, and a datasheet is the maker’s own declaration. A submittal is what the bidder files against each clause; a certificate names models and nothing else. An ecology unit tender goes wrong when one of these is treated as another.

A catalog PDF is pasted in as the specification, so the tender asks for one maker’s dimensions. A datasheet percentage is read as a test result. A certificate for one series is read across the whole train. Decide, line by line, who writes each line and which document answers it.

In the United Kingdom the clause can sit under Section 24 of BESA DW/172, the pollution-control section of the kitchen ventilation specification. The specification is in its second edition (2018), with addenda of April 2020 and May 2024. How that section reads for an in-duct electrostatic precipitator is set out in our DW/172 Section 24 guide. Elsewhere the clause is written from scratch, which is where this sheet is meant to be used. The six documents a supplier can hand over for checking are covered in the commercial kitchen ESP buying guide. This page turns them into clauses and the submittal that answers each one.

A line belongs in the tender when its author is the consultant and its answer is a document; it belongs on the datasheet when only the maker can state it.

DocumentWho writes itWhat it can carryWhat it cannot doWhat to ask for
Specification clauseThe consultant, in the tender or on the equipment scheduleA requirement, the method by which it is proven, and the document that must be filedProve anything by itselfNothing; this is the line you write
DatasheetThe makerDimensions, flanges, weights, supply, design tiers, stage list, the model numberStand in for a test report; a datasheet percentage is a declaration, not a measurementThe datasheet of the model offered, not of the series; how to read it field by field is on our electrostatic precipitator datasheet page
SubmittalThe bidder, against each clauseThe datasheet, drawing, certificate copies, test reports, manual and wiring diagram that answer the clausesAdd a document the bidder does not holdA clause-by-clause reply, with the document named against each clause
Certificate or test reportA certification body or an accredited laboratoryConformity or a measured result for the models it names, under the conditions it statesCover a model it does not name, or a condition it did not testThe copy, with the model list and the test conditions visible

This table answers who writes what. It does not answer which clauses to write; that is the sheet in the next section.

Catalogs, datasheets, the installation and commissioning manual, the certification package and the test reports are sent on request and emailed within one business day. The list is on our downloads page. We do not publish a specification PDF, because a specification is yours to write; what we can give you is the clause set below and the document against each line.

Decision rule. A line that only a bidder’s sentence can answer is not yet a clause, because a clause binds only when a document answers it. Paste the line once a datasheet, a drawing, a certificate copy or a test report can answer it, because each bidder’s answer can then be compared.

The 30-Clause Ecology Unit Specification Sheet

The sheet gives 30 clauses in eight groups, A to H, and against each one names the document we file or states that no supplier can evidence it. The groups follow the order a reviewer reads a schedule: scope and stages, performance basis, construction, electrical, certification and documents, submittal package, acceptance, warranty and spares.

The blanks marked ____ are yours; they hold the design airflow, the supply, the approvals your market needs and the warranty term you want. The fourth column is our side of each clause. It says what we submit. It never says that our equipment meets your clause, because that judgment is the reviewer’s, made on the documents.

Four clauses carry most of the evidence: B1, B3, E1 and H3. The efficiency clause, B1, asks for the test method, the test airflow, the model tested, the report number and the laboratory’s accreditation together. A percentage without those five is not a result. The pressure-drop clause, B3, asks for the figure per stage as a complete module at the design airflow. A collecting cell alone reads far lower than the complete module it sits in.

The certificate clause, E1, asks every certificate to name the models offered, because a certificate covers what it names. The cleaning clause, H3, asks for a written interval for the site and bans a number in the specification, because the interval follows the menu, the hours and the airflow.

The 30-Clause Ecology Unit Specification Sheet. Paste a clause when a bidder can answer it with a document; strike or rewrite it, as the next section shows, when the only possible answer is a promise. Compare each submittal against the fourth column.

#Clause (paste into the tender)What it protects the project fromWhat Polygee submits against itWhat no supplier can evidence
A · Scope and stages
A1The ecology unit shall comprise, in airflow order, an electrostatic precipitator stage, a UV-C stage and an activated carbon stage. No gas-phase stage shall be placed upstream of the electrostatic precipitator stage.A train quoted in another order, or with a stage silently dropped, under the same headingA configuration proposal and a general arrangement drawing showing the three stages in that order. The stages are described on the kitchen ecology unit page and in what an ecology unit isThat the same stages in another order perform the same
A2Design airflow per treatment run: ____ m³/h (____ CFM). Number of parallel runs: ____. Where the total extract exceeds one run, the split shall be shown on the drawing.A unit sized to an average airflow, or one run asked to treat more than its ratingThe module size per run from eight sizes, 3,000 to 15,000 m³/h per run (1,766 to 8,830 CFM). Above 15,000 m³/h the extract is split into parallel runs on the drawingPerformance at any airflow other than the one stated
A3Hood grease filters remain in the hood, upstream of the unit and outside its scope. Their access for cleaning is specified with the hood, not with this unit.A bidder pricing hood filters into the unit, or a tender expecting the unit to replace themA scope statement that excludes hood filters; what the code asks of the filters themselves is a clause in the hood specificationNone
A4Scope of supply: treatment modules with high-voltage power supplies and control gear. Extract fan: ____ (included / excluded); if included, selected to the total static pressure of the configuration. Attenuator, fire damper and ductwork by the ventilation contractor.Two offers with different scopes read as one price differenceA scope-of-supply statement in the proposal; the fan can be supplied with the train, selected on the total static pressure of the configurationNone
B · Performance basis
B1Particle collection efficiency shall be stated with the test method, the test airflow, the model tested, the report number, the laboratory and its accreditation. A percentage without these is not accepted.“99% efficiency” with no condition attached; two figures on different scales compared as oneFor the LK-E stage used in the ecology unit: report ZY-W2020-1116-02C, LK40E2, 96.2%, 96.9% and 94.0%, the three results the report records, with 112 Pa. The test conditions for each, the laboratory and its accreditation are as printed on the report. Reports ZY05W230298 (LK160, 97.6% at 16,000 m³/h, 150 Pa, CMA-accredited laboratory) and ZY05W230296 (LK40, 97.0% at 4,000 m³/h, 50 Pa) test in-duct LK models. So does SQEP report 2024I20-35-5322488001: LK120, 96.0% at rated airflow, 97.4% at 80% and 95.2% at 120% of it, 292 Pa, per HJ/T 62-2001 and DB31/844-2014. These three apply when an LK model is offered, and none of the four tests a three-stage train. Full reports on request.Efficiency on your menu at your airflow before the unit is installed. A figure to ASTM F2519 is a clean-equipment figure measured ahead of the duct, as our ASTM F2519 guide sets out
B2Where a design efficiency tier is offered, it shall be stated separately from any tested figure and shall carry the word “design”.A tier filed as a measurementLK-E design tiers E0 ≥90%, E1 ≥95% and E2 ≥98%, marked design on the LK-E series page; tested values are filed under B1A design tier as a measured result
B3Pressure drop shall be stated per stage, each as a complete module at the design airflow, saying whether the airflow distribution plate is included. Each figure shall state the condition it applies to, clean or at a stated loading, and the total for the train shall be shown.A collecting cell in pascals compared with a complete unit in inches of water, the mismatch described in ecology unit priceOn the datasheet and in the proposal, per model. Measured values exist in the reports under B1 for the models they tested, such as LK40E2 at 112 Pa in ZY-W2020-1116-02CA cell-only figure filed as the complete-module figure, or how the figure moves as cells and media load on your menu
B4Any odor requirement shall be written as the condition that imposes it (lease, authority, planning consent), with the stages assigned to it. No odor removal percentage shall be specified.A percentage nobody can measure before the kitchen cooksA stage-by-stage scope statement, with the UV-C and carbon stages assigned to the odor conditionAn odor removal percentage before installation
C · Construction
C1Collecting cells shall be stainless steel, washable and drawer-type, withdrawable on their own rails from the access side.Cells that can be cleaned only by taking the module apartThe datasheet and the general arrangement drawingNone
C2Flange dimensions per module shall be stated on the drawing. Where flanges of adjacent modules differ, a transition piece shall be shown.Modules that do not line up in the plant roomFlange dimensions by model on the general arrangement drawing; UV and carbon flanges are also tabled on the kitchen ecology unit pageNone
C3The bidder shall state, per model on the general arrangement drawing, the maintenance clearance on the access side of each stage. The same applies to the cell-withdrawal length of the electrostatic precipitator stage. Plant-room space available on the access side: ____ mm.A unit that fits the duct and cannot be opened, the layout fault described in ecology unit installationD = 1,000 mm on the access side of the UV-C and carbon stages, on the general arrangement drawing; the withdrawal length comes with the configuration proposalThat a unit which cannot be opened will be serviced
C4Enclosure ingress protection shall be stated with the test standard, the certificate number, the year of issue and the models it names. The standard is EN 60529, the European adoption of IEC 60529.An IP rating quoted for a module that was never testedIP55 to EN 60529, certificate BKC-190300574C, issued 2019, naming LK30–LK320 and LK30E1–LK150E1; the UV-C and carbon stages are not within that certificateAn IP rating for a module it was not tested on
C5Module weights per model shall be stated for support design.Hangers and slab loads sized on a guessWeights on the datasheet and the general arrangement drawingNone
C6The UV-C stage shall be stated with its lamp wavelength bands and the number of lamps per module, and its access panel shall carry a safety interlock. UV lamps are consumables; the lamp replacement schedule shall be filed with the proposal, and no lamp life in hours shall be written in this specification.A UV-C stage quoted by airflow alone, and a lamp life nobody can holdUV30–UV150, 254 nm and 185 nm dual band, with a safety interlock, as listed on the kitchen ecology unit page. The lamp count per model is on the UV datasheet, and the replacement schedule comes with the proposalA lamp life in hours for your kitchen
C7The activated carbon stage shall be stated with the media type, its iodine value and the number of media frames per module. Carbon media is a consumable; the replacement basis shall be filed in writing with the proposal, and no replacement interval shall be written in this specification.Carbon bought with no media basis, and an interval the first odor complaint contradictsCB30–CB150: coal-based columnar carbon with an iodine value of 800 mg/g or above, on the CB datasheet. The frame count per size is on the kitchen ecology unit page, and the replacement schedule comes with the proposalOne carbon replacement interval for every kitchen
D · Electrical
D1Supply: ____ V, ____ Hz, ____ phase, as measured at the panel feeding the unit. The equipment shall be configured to the stated supply.A build for the wrong frequency or voltage220 V or 380 V, 50 or 60 Hz, configured to order; the brochure input for the LK-E and UV modules is 220 V, 50 HzNone
D2The high-voltage power supply shall be identified by maker and model and shall carry its own certificate and test reports.An unidentified component feeding the fieldThe SPP power supply, made in-house. CE UDEM M.2024.206.C109411. SQEP report 2023I20-35-4562105001: 2,000 V withstand and power factor 0.91. Report TH2408288-C01-R01: full load for 72 h at −40 °C and at 80 °C. That is a component test, not an ambient rating for the installed unitNone
D3A lockable local means of isolation shall be provided for each powered stage. The access door of the electrostatic stage shall be interlocked to de-energize the high-voltage supply when opened.A cell handled with the field liveOn the LK-E stage, opening the maintenance door breaks the high-voltage circuit; the wiring diagrams are in the installation and commissioning manual. The local isolator is in the electrical contractor’s scopeNone
E · Certification and documents
E1Every certificate submitted shall name the model numbers offered. Copies shall be filed with the tender; a logo or a series name is not accepted.A range-wide claim built on a certificate that names part of the rangeCE certificate FQC2602501 (Machinery Directive 2006/42/EC, EMC and LVD), naming LK30–LK480, LK30E1–LK150E1 and the UV series, valid to 2031-01-09. ICR Polska certificate of conformity VC/UA221105 for the UV series, tested to EN standards under a voluntary verification. Copies on request; the list by product line is on the ESP certifications pageA whole range from a certificate that names part of it
E2RoHS compliance shall be stated by series, naming the series covered and those not covered.A certificate held for one stage read across the whole trainRoHS 2.0 certificate BKC25114877LC for the LK, SE, HME, FMC, HPS, RCS and LK/E series. It does not cover the UV series, the CB carbon modules or the SPP power supplyNone
E3Management-system certificates shall be issued to the legal entity that manufactures the equipment.A trading company filing a factory’s certificates as its ownISO 9001:2015 ABZB25Q30072R3M, ISO 14001:2015 ABZB25E30043R3M and ISO 45001:2018 ABZB25S30027R2M, issued to our registered legal entity. The English certificates print it under its transliterated Chinese name, Jiangsu Baolijie Environment Technology Stock Co., Ltd. The ESP certifications page notes that this is the same company operating as PolygeeProduct performance from a management-system certificate
E4Market-specific approvals required by the project: ____. The bidder shall state which of them it holds for the models offered.An approval assumed at tender and discovered missing at submissionYour specification may call for market-specific approvals; state them in the enquiry and we tell you which documents we hold for the quoted modelsAn approval it does not hold
E5Third-party test reports shall be filed in full, with report number, laboratory, accreditation and test conditions. Extracts are not accepted.A percentage separated from the report that produced itThe full reports named under B1, on request, emailed within one business dayA percentage without its report
F · Submittal package
F1Tender submittal per model: datasheet; general arrangement drawing with flanges, clearances and weights; certificate copies; test reports; installation and commissioning manual; wiring diagram.A submission that arrives in pieces after awardAll six on request. The datasheets, certificate copies, test reports and the installation and commissioning manual with its wiring diagrams are listed on the downloads page and emailed within one business day. The general arrangement drawing is prepared for the project, with its extract rate and plant-room dimensionsNone
F2Commercial submittal: proforma invoice with Incoterms and lead time; minimum order quantity; the warranty boundary in writing.A price with no delivery basis behind itA proforma invoice with Incoterms and lead time, the datasheet of the quoted models and the certificate copies that apply to them, within 24 hours on business days. Minimum order one unit; 7–15 days for standard models, as published on our supplier profileNone
G · Acceptance
G1Acceptance shall be in three layers: equipment evidence; installation and interfaces; whole-system operation. Passing one layer does not clear the next.A certificate pack read as a commissioning resultThe layer-one documents in this sheet; a commissioning checklist in the manual for layer two; layer three is the project’s own test at the dischargeLayer three, in advance
G2Each unit shall be inspected at the factory before dispatch.A unit first switched on at siteEvery unit is inspected before it leaves the factoryNone
H · Warranty and spares
H1Warranty: ____ on the complete unit, stating what is covered, what is a consumable and whether labor is included.A warranty that turns out to exclude the stage that failedOne year on the complete unit; the collecting cells and the SPP power supply are covered. UV lamps and carbon media are consumables and excluded. Labor and site attendance are excluded, with paid on-site service available. Written into the quotationNone
H2Spares: common spares shall be held in stock, and spares shall be supplied for ____ after a model is discontinued.A discontinued model with no cells to buyCommon spares held in stock; spares supplied for one year after a model is discontinued. Written into the quotationNone
H3Cleaning interval for the collecting cells: stated in writing for this site with the configuration proposal. No interval shall be written in this specification.A number in the tender that the first week of service contradictsA site-specific written interval with the configuration proposalOne interval for every kitchen

This sheet answers what to write and what to ask for. It does not size the unit or decide which stages your discharge needs; that is the design consultant’s call and the product page’s configuration table.

The sheet covers the treatment modules between the hood filters and the fan. Capture at the hood, the fan duty, the terminal and the fire protection downstream are separate clauses in the ventilation specification, not in this sheet. If the airflow, the menu, the stage count or the market changes, every clause from A2 onward is re-read against the new figures before the tender goes out.

Point to remember. IF a clause names a method, a condition, a model number or a document, THEN paste it, BECAUSE each of those can be checked against a submittal. IF a clause names only a percentage, an interval or a logo, THEN rewrite it as the next section shows, BECAUSE none of those can be checked. A bidder who writes “complies” against such a clause has promised nothing.

Clauses no supplier can evidence, and what to write instead

Five familiar clauses cannot be evidenced before installation. They are a cleaning interval, an odor removal percentage, a lamp life, a standard “met” by inference, and a certificate for the whole range. Each has a reason, and each has a rewrite that keeps the intent and adds a document. We cannot evidence them either, so the fourth column lists what a bidder, ourselves included, can file instead.

Keep the intent of a clause when its only answer is a promise, and change what the bidder must file.

Clause as writtenWhy no supplier can evidence itWrite insteadWhat the bidder files
“Cells shall be cleaned every ____ weeks.”The interval follows the menu, the hours, the airflow and the capture at the hood; the same cells in two kitchens load at different rates“The bidder shall state the cleaning interval in writing for this site with the configuration proposal.” (H3)A written interval for the site, with the proposal; no number appears in the specification
“The unit shall remove ____% of odor.”Odor at the discharge depends on the gas-phase load your cooking produces, which no laboratory has measured before the kitchen exists“The odor condition is imposed by ____ (lease / authority / consent). The UV-C and carbon stages are assigned to it.” (B4)A stage-by-stage scope statement naming the stages assigned to the condition
“UV lamps shall last ____ hours.”Lamp output falls with running time, and the load reaching the lamp rack differs by kitchen; a figure in hours assumes a load nobody has measured“UV lamps are consumables. The bidder shall file the lamp replacement schedule with the proposal.” (C6)The replacement schedule with the proposal, no hours in the specification
“The unit shall meet ASTM F2519” or another standard, by inferenceA test method is not a pass mark. ASTM F2519 describes how to measure grease capture on clean equipment ahead of the duct. A unit “meets” it only in the sense that a report to it exists“Efficiency shall be stated with the test method, the test airflow, the model tested, the report number and the laboratory’s accreditation.” (B1)The report itself, naming the method, the model and the conditions
“The unit shall be CE certified” or “shall carry ____ listing”A certificate names models; the carbon stage, the UV-C stage and the electrostatic precipitator stage may be on different documents or on none“Every certificate submitted shall name the model numbers offered. Copies shall be filed with the tender.” (E1)The copies, with the model list visible, matched to the models in the offer

This table rewrites those five clauses. It does not promise that the rewritten clause will be met; it makes the bidder file something that can be read.

Keep the word “design” on every tier. A design tier is a class the maker assigns to a build, and it belongs on the datasheet with that word attached. A tested figure is one model, one airflow, one report. Our LK-E tiers are written E0 ≥90%, E1 ≥95% and E2 ≥98% design, and the measured values we file sit under B1 with their report numbers. When a tender carries a bare “98%” it has asked for neither, and every bidder can tick it.

One schedule row, written out

A tenderable schedule row carries seven things: airflow per run, stage list, efficiency basis with its report number, pressure-drop basis, supply, certificate numbers and access clearance. Everything else goes in the clauses. The row below shows the consultant’s entry and, beside it, how a bidder fills it. Where a cell would hold a number without a basis, it stays blank and points to the clause, because the bidder supplies the basis, not the consultant.

Teaching example only — not Polygee test data, not a product claim, not an acceptance threshold.

A schedule cell takes a number when a report or certificate stands behind it; otherwise it takes a blank and a clause reference.

Schedule fieldConsultant’s entry at tenderHow a bidder fills it (example entries)
TagEU-01, serving extract run ____EU-01
Stages, in airflow order (A1)Electrostatic precipitator, UV-C, activated carbonLK-E1 electrostatic stage, UV-C stage with 254 nm and 185 nm lamps, CB activated carbon stage
Design airflow per run (A2)____ m³/h (____ CFM); runs in parallel: ____The module size selected within 3,000 to 15,000 m³/h per run; number of runs as shown on the drawing
Efficiency basis (B1, B2)Design tier: ____ (marked design). Tested: method / airflow / model / report / laboratoryDesign tier E1 ≥95% design. Tested: the reports under B1, each filed in full for the model it names
Pressure drop per stage (B3)____ / ____ / ____ Pa, each as a complete module at the design airflow, with its condition stated; distribution plate included: yes / noStated per module on the datasheet and in the proposal at the design airflow; cell-only figures are not entered here
Supply (D1)____ V / ____ Hz / ____ phase, as measured at the panelConfigured to the stated supply; brochure input 220 V, 50 Hz
Certificates naming the models offered (E1, E2)Number / scope / models named / expiryCE FQC2602501 naming LK30–LK480, LK30E1–LK150E1 and the UV series, to 2031-01-09, matched to the LK-E1 and UV models offered; RoHS BKC25114877LC for the LK/E series, not for the UV series or the CB carbon modules
Ingress protection (C4)Standard / certificate / year / models namedIP55 to EN 60529, BKC-190300574C, 2019, naming LK30E1–LK150E1; the offered LK-E1 model checked against that list; UV-C and carbon stages not within it
Access clearance (C3)____ mm available on the access side; clearance per model on the bidder’s drawingD = 1,000 mm on the access side of the UV-C and carbon stages, on the drawing; withdrawal length with the configuration proposal
Cleaning interval (H3)Stated in writing for the site with the proposal; no figure hereWritten interval filed with the proposal

This row shows where a basis belongs and where a blank belongs. It does not size EU-01 or pick its tier; the airflow and the menu do that, and the entries in the third column are examples of form, not an offer.

Scope and limits

Acceptance clears in three layers, and a complete submittal clears only the first.

  1. Layer one, equipment evidence: the datasheets, drawings, certificate copies and test reports this sheet makes a bidder file.
  2. Layer two, installation and interfaces: the duct route, the access side, the supports, the supply, the isolator and the fan duty decide whether the configuration goes in as submitted.
  3. Layer three, whole-system operation: delivered airflow, capture at the hood, the cleaning interval kept and the consumables changed decide the result at the discharge.

Passing one layer does not clear the next. A complete submittal belongs to layer one only.

  • This page does not replace the consultant’s design. The airflow per run, the stage count and the discharge condition are design decisions; the sheet only makes them tenderable.
  • It is not a compliance opinion. Whether a market requires an approval, and which, is the project’s question. State the approvals in clause E4 and in the enquiry, and we tell you which documents we hold for the quoted models.
  • No price appears here. The quotation follows the configuration; what moves it is set out in ecology unit price.
  • Certificates cover the models they name. Our CE certificate names LK30–LK480, LK30E1–LK150E1 and the UV series; our RoHS certificate does not cover the UV or carbon modules; our IP55 certificate does not cover them either. Check every model number in every offer, ours included.
  • No cleaning interval, lamp life, odor percentage or fan figure is given. The cleaning interval and the lamp and carbon replacement schedules come in writing with the proposal; the fan, where supplied, is selected to the total static pressure of the configuration.
  • Efficiency figures apply where they were measured. Each report names one model at the airflows it tested; request the report itself and check the model and the test conditions before treating any figure as a performance basis.
  • The hood, the fan, the terminal and the fire protection are outside the sheet. They are clauses in the ventilation specification, with their own documents.

Buyer record

Have six inputs ready before the tender goes out, require six items of every bidder, and re-read the sheet when the airflow, menu, stages, discharge condition or market changes.

  • Have ready:
    • The design airflow per run and the number of runs.
    • The menu and the fuel, including charcoal or wood.
    • The condition that imposes any odor requirement, in writing.
    • The supply as measured at the panel.
    • The market and the approvals it requires.
    • The reviewer the submittal goes to, and the document list they issue.
  • Require of every bidder:
    • A clause-by-clause reply, naming the document that answers each clause.
    • The datasheet of the model offered, not of the series.
    • The general arrangement drawing with flanges, clearances and weights.
    • Certificate copies with the model list visible.
    • The full test reports and the installation and commissioning manual with its wiring diagrams.
    • The warranty boundary and the cleaning interval, in writing.
  • Stop and ask when: a percentage arrives without a report. A certificate arrives without a model list. A pressure drop arrives without saying whether it is a cell or a complete unit. A scope arrives without saying whether the fan is in it.
  • Re-read the sheet when: the airflow, the menu, the stage count, the discharge condition or the market changes. Every clause from A2 onward moves with those.

Key takeaways

  • Clause test: a clause is enforceable when a document can be put against it, not when a bidder can write “complies”.
  • Efficiency: method, airflow, model, report number and accreditation together, not a bare percentage; a design tier carries the word “design” and sits apart from the tested figure.
  • Pressure drop: per stage, each as a complete module at the design airflow, not a cell-only figure.
  • Certificates: the model list on the copy, not the logo or the series name; the 30-Clause Ecology Unit Specification Sheet asks for the copy in E1.
  • Cleaning: a written interval for the site with the proposal, not a number in the tender.

Frequently asked questions

What should an ecology unit specification include?
Eight groups of clauses: scope and stages, performance basis, construction, electrical, certification and documents, submittal package, acceptance, and warranty and spares, each worded so that a document answers it. The 30-Clause Ecology Unit Specification Sheet on this page gives the clause text for each group. Blanks are left for the design airflow, the supply, the approvals your market needs and the warranty term. Anything that can only be answered with a promise, such as a cleaning interval or an odor percentage, is rewritten so the bidder files a document instead.
Is a design efficiency the same as a tested efficiency?
No. A design tier is a class the maker assigns to a build, and it belongs on the datasheet with the word “design” attached. Our LK-E tiers are E0 at or above 90%, E1 at or above 95% and E2 at or above 98%. A tested efficiency is a result for one model under the conditions of one report. For the LK-E stage, report ZY-W2020-1116-02C records three results for LK40E2, 96.2%, 96.9% and 94.0%; for the in-duct LK series, report ZY05W230298 records LK160 at 97.6% at 16,000 m³/h. Specify both separately and do not let a tier be filed as a measurement.
Does a CE certificate cover the whole range?
No; a certificate covers the models it names. Our CE certificate FQC2602501 names LK30–LK480, LK30E1–LK150E1 and the UV series, and a model not on that list is not covered by it. Write the clause so that every certificate filed names the model numbers offered, and match the offer against the copy rather than against a logo or a series name.
Can I specify a cleaning interval for the ESP cells?
Not as a number in the specification. The interval follows the menu, the operating hours, the airflow and the capture at the hood, so the same cells load at different rates in different kitchens. Write the clause so that the bidder states the interval in writing for your site with the configuration proposal; that is what we do. Keep the figure out of the tender text.
What do you submit against a tender specification?
A clause-by-clause reply, naming the document that answers each clause. The documents are the datasheet of the quoted models, the general arrangement drawing with flanges, clearances and weights, and certificate copies that name the models offered. The full third-party test reports and the installation and commissioning manual with its wiring diagrams complete the set. The datasheet, certificate copies, test reports and the manual are emailed within one business day on request; the general arrangement drawing is prepared for the project. The commercial side is a proforma invoice with Incoterms and lead time, within 24 hours on business days, with the warranty boundary and the site cleaning interval in writing.

Writing an ecology unit specification for a tender?

Send us the clause list you intend to issue, the design airflow per run and the number of runs. Add the name of the reviewer the submittal goes to, with their document list. We come back with a clause-by-clause reply, naming the document that answers each clause. With it comes a configuration proposal for the stages your condition assigns. The quotation is a proforma invoice on EXW, FOB, CIF or another Incoterm arranged to suit you, with the lead time. It carries the datasheets of the quoted models and the certificate copies that apply to them. The full third-party test reports are emailed within one business day on request; the general arrangement drawing is prepared for the project and follows on request.

Send your clause list →

Why we write this. We prepare the submittal package that a bidder files against a kitchen exhaust specification. The questions consultants put to us first are which certificate covers which part of the train, and what to write instead of a cleaning interval. This page answers them clause by clause, with the document that answers each line. It does not size or configure equipment; sizing and quotation live on the kitchen ecology unit page.

L
Written by Law · Project Manager, Polygee

Law manages project delivery at Polygee, from application review and equipment configuration through the submittal package that consultants file against a specification. Polygee, founded in 2004, manufactures the in-duct electrostatic precipitators, UV-C and activated carbon modules described here and has exported to 50 countries. This page states our published terms and the documents we file; it is not a specification, a mechanical design, a conformity declaration, a compliance opinion or an approval.


References & further reading

  1. Efficiency test method: ASTM F2519-05(2025), Standard Test Method for Grease Particle Capture Efficiency of Commercial Kitchen Filters and Extractors, ASTM International, shown Active on the ASTM store. Clause 1.1 covers components and systems that capture grease before it enters the exhaust duct; clause 1.2 measures new or clean filters. store.astm.org (ASTM F2519)
  2. Ingress protection: IEC 60529:1989+AMD1:1999+AMD2:2013 CSV, Edition 2.2, Degrees of protection provided by enclosures (IP Code), International Electrotechnical Commission. EN 60529 is the European adoption; our IP55 certificate BKC-190300574C is issued to EN 60529. webstore.iec.ch (IEC 60529)
  3. UK kitchen ventilation specification: BESA DW/172 Specification for Kitchen Ventilation Systems, Second Edition (2018), with addenda of April 2020 and May 2024, Building Engineering Services Association; Section 24 covers pollution control. publications.thebesa.com (DW/172)
  4. Named, not linked: Machinery Directive 2006/42/EC, under which, with the EMC and Low Voltage directives, CE certificate FQC2602501 is issued. ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 are the management-system standards behind certificates ABZB25Q30072R3M, ABZB25E30043R3M and ABZB25S30027R2M. HJ/T 62-2001, the Chinese technical requirements and test specification for catering fume purification equipment, and DB31/844-2014, the Shanghai catering fume emission standard, are the standards cited in SQEP report 2024I20-35-5322488001. Certificate and report copies are sent on request from the ESP certifications page.