Mixed-Use Building Kitchen Exhaust Electrostatic Precipitator Case Study: Centralised Rooftop ESP for the Restaurants of Hedong Junhao Garden, Shenzhen

A mixed-use building kitchen exhaust electrostatic precipitator is an in-duct ESP stage placed where the podium’s restaurant exhaust is collected, usually on the podium roof below the residential towers, so that one treatment stage serves the collected duct. At Hedong Junhao Garden in Shenzhen, Polygee supplied the in-duct units that treat the development’s restaurant exhaust centrally on a roof terrace, a stated 200 thousand m³/h.

The cheap part of a podium exhaust project is the treatment cabinet. The expensive part is finding out after the towers are sold that the collected exhaust discharges under apartment windows, that the fan was selected without the treatment stage, or that the whole podium was sized by counting shops instead of measuring air.

This page helps you decide whether the restaurant exhaust of a podium with homes above it should be treated centrally in in-duct cabinets on the roof rather than outlet by outlet, and what to write down before you ask for a quotation. It does not size or select the units: the capacity logic for a collected riser is on our food court ESP page, and the cabinet families are on the in-duct kitchen electrostatic precipitator range. For the drawing check that follows a quotation, see the drawing approval guide.

QuestionShort answer
What was installedPolygee in-duct electrostatic precipitators, listed in the project record as the LKE series, standing on a roof terrace; the record says the development’s restaurant exhaust is collected and treated centrally and states a total airflow of 200 thousand m³/h
WhereHedong Junhao Garden, Xixiang Sub-district, Bao’an District, Shenzhen: a mixed-use development of about 160,000 m² with a three-level basement, a five-storey retail podium and four towers of homes, serviced apartments and offices, per the project note
Standard in forceGB 18483-2001, the national standard: abatement equipment mandatory, tested and passed before installation; 2.0 mg/m³; 60, 75 or 85 percent removal by kitchen size. Shenzhen’s own municipal specification sits above it; its text is not reproduced here. A Guangdong provincial draft circulated for comment in 2024, after this record, proposes 1.0 mg/m³ of cooking fume and 10.0 mg/m³ of non-methane hydrocarbons for medium and large kitchens, a fan interlock, a quarterly cleaning log, each unit’s fume treated to the limit before any shared flue, and a stack outlet turned away from affected buildings; it is not a text this project was built to
What is on recordA project note dated 22 March 2024 with rooftop photographs, reproduced on this page, and the stated total airflow
What is not on recordUnit count, airflow per cabinet, tier, which outlets connect to the roof, installation date, certification record and stack test results; this page does not estimate them
What you take awayThe 8-Row Hedong Junhao Project Record, with a third column to fill for your own development

What is on the roof terrace at Hedong Junhao Garden

Hedong Junhao Garden is a mixed-use development of about 160,000 m² in Xixiang, Bao’an District, Shenzhen, whose restaurant exhaust is collected and treated centrally on a roof terrace by Polygee in-duct electrostatic precipitators, with a stated total airflow of 200 thousand m³/h. The project note describes the development as a three-level basement, a five-storey retail podium and four towers combining homes, serviced apartments, offices and shops; most sales listings for the project carry the same floor area and composition, one gives a slightly larger figure, and the listings name the developer as a community joint-stock company of the Hedong neighbourhood, the same body that Guandian reported via Winshang in October 2018 as the applicant for the district’s urban renewal unit. The listings are sales material rather than planning documents, so this page takes the floor area from the project note and rounds it, and treats the developer’s name as the listings’ statement.

The record we hold is a project note published on 22 March 2024, which lists the equipment as the LKE series, Polygee’s in-duct electrostatic precipitator family, describes its cells as a dual-zone plate-type electrostatic field with a smart power supply, states that the restaurant exhaust is collected and treated centrally at 200 thousand m³/h, and carries the rooftop photographs reproduced here. The note does not state the number of cabinets, the tier chosen, which outlets connect to the roof or the date of installation, and this page does not guess them. What it does let a buyer do is read the arrangement, name the standard that applied, and separate the rows that documents fill from the rows that only a photograph fills.

The 8-Row Hedong Junhao Project Record below sets out this project in eight rows: the second column filled from the documents and photographs in the record, the third column left for the development you are planning.

RowHedong Junhao GardenYour project
1. SiteHedong Junhao Garden, Xixiang Sub-district, Bao’an District, Shenzhen; about 160,000 m² of floor area; a three-level basement, a five-storey retail podium and four towers of homes, serviced apartments and offices, per the project note 
2. Cooking zones servedThe development’s restaurant exhaust, which the note says is collected and treated centrally; the note does not list which outlets connect to the roof 
3. Treatment stagePolygee in-duct electrostatic precipitators (the LKE series in the project note); dual-zone plate-type cells with a smart power supply; stated total airflow 200 thousand m³/h 
4. ArrangementLarge treatment cabinets side by side in an L on a roof terrace, with blue control cabinets at their side; a centrifugal fan beside the cabinets, connected by rectangular duct 
5. Position in the exhaust lineOn a roof terrace, with high-rise residential blocks in the background 
6. Standard in forceGB 18483-2001: abatement equipment mandatory, tested and passed before installation; 2.0 mg/m³; 60 / 75 / 85 percent by size; Shenzhen’s municipal specification above it (text not reproduced). Draft to watch, issued for comment after this record and not applied to it: Guangdong 2024, 1.0 mg/m³ of cooking fume and 10.0 mg/m³ of non-methane hydrocarbons for medium and large kitchens, fan interlock, quarterly cleaning log, each unit treated to the limit before any shared flue, stack outlet away from affected buildings 
7. On public recordThe project note of 22 March 2024 with rooftop photographs and the stated total airflow; the development facts in row 1 
8. Not on public recordUnit count, airflow per cabinet, tier, which outlets connect to the roof, installation date, certification record, stack test results 

This table answers what can be stated about the Hedong Junhao installation from documents and photographs. It does not answer what your development needs; that is the third column, and the inputs for it are listed in the section on copying this project.

Centralised in-duct electrostatic precipitator cabinets on a roof terrace at Hedong Junhao Garden, Shenzhen: large stainless steel treatment cabinets in an L with a blue control cabinet, an orange centrifugal fan beside them and high-rise residential blocks behind
The centralised cabinets on the roof terrace. The treatment cabinets stand side by side in an L with a blue control cabinet at their side; the centrifugal fan is connected beside them, and high-rise residential blocks stand in the background. Photograph from Polygee’s project record, March 2024.

Decision rule. IF a reference project is offered to you as proof, THEN ask which of the eight rows the supplier can fill from a document rather than a photograph, BECAUSE a photograph fills rows 4 and 5, the note fills row 3, and the rows that decide a quotation are 2, 6 and 8.

Centralised or grouped: how this roof differs from a mall roof

Hedong Junhao Garden, per its project note, collects its restaurant exhaust and treats it centrally on a roof terrace; Caohejing InCity, the Shanghai mall on our shopping mall electrostatic precipitator case study, treats its risers in separate two-high trains. Which arrangement fits a project is decided by the risers and the roof, not by the cabinet. Where the podium’s outlets can be ducted to one collection point and the roof can give that point a terrace, one large train with cabinets side by side is the simpler plant; where the outlets exhaust through risers that reach the roof at different places, a train per riser is the only arrangement that does not move air across the roof.

Orange centrifugal exhaust fan connected beside the electrostatic precipitator cabinets on the Hedong Junhao Garden roof terrace
The centrifugal fan connected beside the treatment cabinets. A fan serving a treatment train is selected on the total static pressure of the system with the treatment stage in it; the cabinets’ own resistance is one line in that total.

Three things in the photographs belong on a roof plan alongside the cabinet count. The cabinets stand side by side with the control cabinets at their side, so a terrace plan carries a clear strip along the cabinet face for cell withdrawal; the withdrawal length depends on the model, so ask for the model drawing rather than a rule of thumb. A fan serving the train is selected on the total static pressure of the system with the treatment stage in it; whether that was recorded here is not public. And high-rise residential blocks stand in the background, which puts the stack outlet, not the cabinet, at the centre of the odour question: the electrostatic stage collects particle-phase fume, and what the apartments smell depends on where the discharge points and whether a UV-C or carbon stage sits on the duct, as our ecology unit page sets out.

Overview of the Hedong Junhao Garden roof terrace with the electrostatic precipitator cabinets, exhaust fan and the city skyline with high-rise residential blocks behind the railing
The terrace seen from the railing side, with the cabinets and fan in the foreground and high-rise blocks behind. The distance from the discharge to the nearest windows is a line on the roof plan, not an afterthought.

One large train and several small ones answer different questions, and the table below says which question each answers.

QuestionCentralised trainGrouped trains
When it fitsOutlets can be ducted to one collection point; the roof gives that point a terraceRisers reach the roof at different places; each is treated where it arrives
What sets the sizeThe total collected airflowThe airflow of each riser, one train each
FootprintCabinets side by side with one clear strip for cell withdrawal, plus the fansEach train with its own duct transition and door clearance
FanFans beside the train, selected on the total static including the treatment stageA fan cabinet beside each train, each selected on its own total static
Odour stageOne UV-C or carbon stage on the collected duct serves every outlet, so a single heavy tenant is treated with all the othersA UV-C or carbon stage on the one riser that needs it
Evidence to requestModel test report for the cabinet type; commissioning record of the collected airflow against ratingModel test report; commissioning record per riser

This table answers which arrangement a roof calls for; its rows are design logic, not statements about either roof. The Hedong Junhao Garden record fills only the first two rows of the left column, centralised treatment and a stated total airflow; the Caohejing InCity record fills only the first row on the right, since its airflow per riser is not on record. It does not answer how many cabinets either roof carries; for this roof that figure is not on record, and for the mall roof it is not either.

The cabinet family is the same in both cases: a large collected duct is built from units in parallel or stacked layers, the arrangement our in-duct electrostatic precipitator pages describe for ducts wider than one cabinet, and for a collected riser serving a food court the food court ESP page sets out the centralised architecture. Which tier or how many units the Hedong Junhao roof carries is not in the record, and this page does not map the designation in the note onto an export model number. Whether a multi-tenant floor may take one train at all under its duct code, and who buys it under its lease, is the question our food court kitchen exhaust guide answers before the cabinet count.

Decision rule. IF the podium’s outlets can be ducted to one point on the roof, THEN plan one centralised train and put the discharge position on the roof plan before the cabinet count, BECAUSE the collected airflow sets the cabinets, but the discharge position and the distance to the nearest windows are what the residents will judge.

What the national standard asks, and what the Guangdong draft would add

The national standard GB 18483-2001, Emission standard of cooking fume, in force since 1 January 2002, makes abatement equipment mandatory for every cooking business, requires under clause 7.3 that the equipment be tested and passed by a nationally recognised body before installation, sets 2.0 mg/m³ at the stack, and sets a minimum removal efficiency of 60, 75 or 85 percent graded by the number of reference burners: fewer than three, three to six, six or more. Shenzhen has also issued a municipal control specification for cooking-fume emissions, reported by China Economic Weekly in September 2017 as stricter than the national standard and as adding a VOC limit; its clauses are not reproduced here.

Guangdong province has a draft provincial standard, Emission standard of oil fume pollutants for cooking, circulated for comment by the provincial ecology and environment department in 2024 under the placeholder number DB44/XXXX. It is a draft, not a standard in force; its file is dated July 2024, after the project record of March 2024, so it is not a text this project was built to, and this page treats it as a signal of what a Shenzhen project may be asked for rather than as a current requirement.

Each clause maps to one decision on a roof like this, which is why the standard, not the cabinet catalogue, is the first document to read on a Shenzhen project.

RequirementWhere it standsWhat it asks of a roof like this
Abatement equipment mandatory for every cooking businessGB 18483-2001, 5.1, in forceEvery outlet’s exhaust passes a treatment stage; a cooking line that bypasses it is a breach, not a saving
Equipment tested and passed by a recognised body before installationGB 18483-2001, 7.3, in forceThe model test report is a document to request with the quotation, separate from any stack test
Cooking fume not above 2.0 mg/m³; equipment removal 60, 75 or 85 percent by sizeGB 18483-2001, 4.1 and 4.2, in forceA podium with several restaurants is likely to fall in the largest class on the burner count; the equipment figure to apply is the one for that class
1.0 mg/m³ of cooking fume and 10.0 mg/m³ of non-methane hydrocarbons for medium and large kitchens, measured at the stack or the equipment outletGuangdong draft, Table 2, proposedPlan for the stricter figures now; the stack test, not the nameplate, is where they would be read
Treatment interlocked with the exhaust fan and running throughout cooking; cleaning or media change at least quarterly, recorded, log kept one yearGuangdong draft, 4.2.2, proposedFans and cabinets started and stopped together, and a cleaning record for the whole train; the interval that applies is given in writing with the quotation
Each catering unit’s fume treated to the limit on its own before it enters any shared flue; stack outlet turned away from buildings likely to be affectedGuangdong draft, 4.2.3, proposedOn that wording a shared riser treated only on the roof would need each outlet’s own stage, or an arrangement agreed with the local bureau; whether the Hedong Junhao Garden roof would be affected is a question for its owner when the standard is issued. The discharge position stays a design line on any roof with homes behind it
Permanent sampling port and platformGuangdong draft, 5.1.1, proposedPlan the test port with the duct so the acceptance test is read, not argued

This table answers what the standards in force and in draft ask of an installation like this one. It does not answer whether this installation passed its stack test; that record is not public, and the section below says so.

Outside China the lines change and so does who asks. In the Gulf the requirement usually comes from the landlord’s fit-out manual rather than a code, as our ecology unit requirements page sets out; in the United Kingdom odour is handled through the planning condition described on our kitchen odour control UK page; in the United States the mechanical code governs the exhaust system, as on our exhaust fan requirements page. A layout installed in Shenzhen is evidence of an arrangement, not of compliance anywhere else.

Decision rule. IF your project is outside Shenzhen, THEN replace the lines in row 6 with the clause your own authority or landlord applies before you copy this layout, BECAUSE a limit, a certification route and an interlock rule are set per jurisdiction, and a reference project proves the arrangement, not the paperwork.

What the public record proves, and what it does not

The record shows where the train stands, how it is arranged, which family it belongs to and what total airflow the note states; it does not show how many cabinets were installed, which tier was chosen, when they went in or what the stack test read. A buyer who takes the photographs and the stated airflow as proof of performance is reading into them something they do not contain, and a supplier who lets that happen is selling a photograph.

Proven by the record:

  • The development and its composition, from the project note.
  • That the development’s restaurant exhaust is treated centrally by Polygee in-duct electrostatic precipitators at a stated 200 thousand m³/h, from the project note.
  • The arrangement: large cabinets in an L, blue control cabinets at their side, a centrifugal fan beside the cabinets, high-rise blocks in the background, from the photographs.
  • The standard in force for a Shenzhen cooking business, from the standard itself, and the draft that may follow it, from the draft.

Not proven by the record:

  • The number of cabinets, the airflow per cabinet and the tier, because no document in the record states them; the stated figure is a total.
  • The removal efficiency on this roof, because no stack test is public and no model test report is attached to the note.
  • The installation date, because the note is dated March 2024 and the record does not say which year the train went in.

Evidence for an installation like this comes in three layers, and passing one layer does not clear the next. The first is equipment evidence: the product certification and the laboratory test report for the model, which say what the cabinet did under test conditions; how to read such a report is on our electrostatic precipitator test report page. The second is installation evidence: the collected airflow against the train’s rating, the fan interlock, the test port, recorded at commissioning, as described on the commissioning page. The third is operating evidence: the stack measurement under cooking load and the cleaning log. This page can show the arrangement the second layer was built on; it cannot show the first layer’s documents for this building, nor the second or third layer.

Our published project list carries other multi-outlet buildings with their counts: Tun Razak Exchange in Kuala Lumpur was supplied in 2022 with 300 LK-E and UV series units, and the Dubai Mall project took 40 units on an ODM basis in 2017. Those records state a count; this one states a total airflow, and the difference is written in rows 7 and 8 rather than filled from the other projects.

Decision rule. IF the performance of a reference installation matters to your decision, THEN ask for the model test report and the commissioning record rather than more photographs, BECAUSE the photographs settle the arrangement, and the arrangement is the one thing a photograph can settle.

Copying this for your own development: what to write down before you ask for a quote

Fill the third column of the 8-Row Hedong Junhao Project Record, add the total extract rate of the collected duct and the fan’s spare static pressure, and the first quotation round goes to a drawing instead of a guess. The inputs are ones a developer’s MEP manager or a consultant already has, or can read off the ventilation drawings.

  • Outlets and what they cook. The number of restaurant units on the podium and the cooking type of each: wok, grill, fryer, bakery, charcoal. This sets the tier and whether an odour stage goes on the collected duct from the start.
  • Total extract rate and its route. The design airflow of the collected duct at full operation, in m³/h, and the path the risers take to the collection point. This is the figure the train’s rated airflow has to meet, and the route decides centralised against grouped.
  • Terrace area and access. The footprint and height available on the roof, the clear strip along the cabinet face for cell withdrawal, and the route for carrying cells to a wash point.
  • Fan status. Whether the exhaust fans are already selected and what static pressure margin they have, or whether they are still to be chosen with the treatment stage in the total.
  • Distance to the nearest windows. Where the discharge points and how far the nearest apartment, office or hotel windows are, in plan and in height. This decides the discharge position and the odour stage before the cabinet count.
  • The local lines for row 6. The concentration limit, the certification route and the interlock rule your authority or landlord applies, with the clause numbers, and any draft that is expected to replace them.

The mistakes that come up in podium exhaust projects come from skipping one of those lines, not from choosing the wrong cabinet.

  • Sizing by counting shops. The train is then rated for a number of outlets rather than for the collected airflow, and the commissioning record shows the duct carrying more air than the rating.
  • Selecting the fans without the treatment stage. The fans run short of static pressure once the cabinets are in, and the collected airflow falls below the figure the train was rated for.
  • Discharging towards the towers. The electrostatic stage does its work and the apartments still complain, because the discharge position and the odour stage were never drawn.
  • Leaving out the test port. The stack cannot be measured where the method says to measure it, and the acceptance test is argued instead of read.

Once the record is filled, the next two documents are the general arrangement drawing, checked line by line as the drawing approval guide describes, and the commissioning record that closes the installation layer.

Decision rule. IF you cannot fill the total extract rate of the collected duct, THEN get it from the ventilation design before you request a quotation, BECAUSE every other line in the record follows from it and a quotation without it is a price for a cabinet, not for your podium.

Buyer record and key takeaways

Before a podium exhaust treatment is quoted, these five items are in your file.

  • The 8-Row Hedong Junhao Project Record with the third column filled for your development.
  • The total extract rate of the collected duct, with the outlets and cooking types on it.
  • The roof plan showing the terrace for the train, the cell-withdrawal strip and the discharge position.
  • The fan selection or its static pressure margin.
  • The clause your authority or landlord applies for the limit, the certification route and the interlock, with its number.

Key takeaways

  • Centralised or grouped is decided by the risers: outlets that can be ducted to one point take one train; risers that reach the roof apart take a train each.
  • The collected airflow sets the train, not the number of shops; the note here states the airflow and not the count, and the record keeps that distinction.
  • The discharge position is a design line on a podium with homes above; the draft provincial standard would write it into the rule, and the residents already apply it.
  • A standard in force and a draft are different documents: GB 18483-2001 sets 2.0 mg/m³ and 60 to 85 percent today; the Guangdong draft proposes 1.0 mg/m³, an interlock, a quarterly log and treatment by each unit before any shared flue.
  • A photograph proves the arrangement; the count, the tier, the efficiency and the date come from the delivery note, the test report and the commissioning record.

Frequently asked questions

How many electrostatic precipitator units serve Hedong Junhao Garden?
The public record does not say. The project note of March 2024 names the equipment family, states a total airflow of 200 thousand m³/h and shows the rooftop train, and nothing in it states a cabinet count, a tier or an installation date. When a supplier offers you a reference project, ask for a document that states the count: the delivery note, the general arrangement drawing or the commissioning record. A count that no document supports is treated here as not on record.
Can one rooftop electrostatic precipitator train serve all the restaurants in a mixed-use building?
Yes, when the outlets can be ducted to one collection point, the train’s rated airflow is not below the collected airflow, and the roof can give the train a terrace with a clear strip for cell withdrawal. Hedong Junhao Garden is treated centrally in that way, per its project note; whether its rating against the collected airflow was recorded is not public. Where the risers reach the roof at different places, a train per riser, as on the Caohejing InCity roof, is the arrangement that does not move air across the roof.
Does an electrostatic precipitator stop complaints from the apartments above a podium?
It removes the particle-phase fume that smoke and grease complaints are made of, which is the cooking-fume figure a stack test measures; the Guangdong draft would add a non-methane hydrocarbon figure beside it. Odour from a particular cuisine is a separate question for a UV-C or carbon stage on the collected duct, and where the discharge points relative to the nearest windows is a design line on the roof plan. The Guangdong draft would require the stack outlet to be turned away from affected buildings; on a podium with towers behind it, that line is drawn before the cabinet count.

Planning kitchen exhaust for a podium with homes above it?

Send us the number of restaurant outlets, the design extract rate of the collected duct and the terrace area you can give the treatment train. You get back the in-duct electrostatic precipitator options for the collected airflow with their rated airflow and equipment resistance, the general arrangement drawing showing the cabinets, the fans and the cell-withdrawal strip, and the drawing-approval checklist, with pricing on request.

Send the collected airflow →

If the cabinet family is still open, start from the kitchen electrostatic precipitator range; for a collected duct serving twenty or more outlets, the food court ESP page sets out the centralised architecture.

Why we write this. A developer comparing suppliers wants a project with homes above the restaurants before a price, and a project page has to answer three questions: where the train went, what the local standard wanted, and what can be checked. This page answers them for one Shenzhen podium with the photographs from our own record, the standard’s own clauses and the draft’s own text, and it says which rows the record cannot fill. It does not size or configure equipment; sizing and quotation live on the product pages.

L
Written by Law · Project Manager, Polygee

Law manages project delivery at Polygee and prepares the factory documents that go into contractors’ submittals. Polygee, founded in 2004, manufactures the in-duct electrostatic precipitators, kitchen ESP hoods and kitchen ecology units named here and has exported to 50 countries. The rooftop photographs are from Polygee’s own project record; the development facts, the standard’s clauses and the draft’s text are from the published sources listed below.


References & further reading

  1. State Environmental Protection Administration, GB 18483-2001, Emission standard of cooking fume (trial), in force 1 January 2002: clauses 4.1, 4.2, 5.1 and 7.3. zj.gov.cn archive
  2. Guangdong Provincial Department of Ecology and Environment and Guangdong Administration for Market Regulation, Emission standard of oil fume pollutants for cooking, draft for comment, DB44/XXXX, 2024: clauses 1, 4.1.2 and Table 2, 4.2.1 to 4.2.3, 5.1.1 and 7.3. yjzj.cloud.gd.gov.cn
  3. China Economic Weekly, Over 300 volatile organic compounds in cooking fumes: a VOC limit may enter the cooking-fume emission standard, 18 September 2017. paper.people.com.cn
  4. Guandian via Winshang, Two urban renewal projects approved in Hedong and the Xicheng industrial zone, Bao’an, Shenzhen, 15 October 2018. winshang.com
  5. Polygee, project note: Hedong Junhao Garden cooking-fume purification project, 22 March 2024, WeChat. mp.weixin.qq.com
  6. Sales listing for Hedong Junhao Garden carrying the same floor area and composition as the project note, NetEase channel, 14 June 2026 (sales material, cited for corroboration only). 163.com

Related reading